The Operational Bottleneck
Commercial facilities, data hubs, and critical manufacturing lines suffer from phase unbalance, neutral-to-ground noise, and grid voltage sags. Conventional mechanical transfer switches produce contact arcing and take 30–50ms to switch, triggering equipment resets and semiconductor stress.
AISPL 3-Tier Hardware Response
Power monitoring, active harmonic conditioning, galvanic fault isolation and dual-source automatic transfer systems.
Deterministic 3-Tier Topology
Strict functional separation guarantees that field sensory inputs, high-speed switching logic, and cloud telemetry run without bus resource contention.
Field Devices
- ›Three-Phase 415 VAC Grid Mains Feed
- ›Dedicated Auxiliary Generator Bus
- ›Rooftop PV Micro-Inverter Solar Input
Core Actuators
- ›DSAPS-2S-100W-V2 Solid-State Phase Shifter (sub-10ms transfer)
- ›LCP-230V Active Earth Leakage Sensing Unit (<10mA trip)
- ›Active Harmonic Filtering & Soft-Start Zero-Cross Switching
Supervisory Uplink
- ›WiseGrid AnalytIQ High-Speed Edge Telemetry Node
- ›Galvanically Isolated MODBUS RTU Fieldbus Loop
- ›TLS 1.3 Secure MQTT Telemetry Broker to Facility SCADA
Validated Bill of Materials (BOM)
| # | PART NUMBER | DESCRIPTION & RATING | ESTIMATED QUANTITY | SUBSYSTEM ROLE |
|---|---|---|---|---|
| 1 | DSAPS-2S-100W-V2 | Dual Source Automatic Phase Shifter, 230VAC, 100W/channel, sub-10ms solid-state commutation | 1 per critical distribution board | Primary/Secondary Phase Shifting |
| 2 | LCP-230V | Leakage Current Protector, 230VAC, 10mA threshold, DIN-rail mounting | 1 per branch circuit | Galvanic Fault Isolation |
| 3 | DCS-200W-U | DALI-2 Contactor & Power Switch, 200W rating, DALI-2 DT7 / AU999 protocol | As required by sub-loads | Auxiliary Load Shedding |
| 4 | WG-ANALYTIQ-01 | WiseGrid Edge Analytics Node, Ethernet + RS-485 MODBUS RTU, 16-bit ADC True-RMS | 1 per electrical room | Supervisory Power Telemetry |
Included Hardware Modules
DALI Controlled Contactor
Precision 16A inrush zero-voltage crossing switching contactor with native IEC 62386-101/102 bus isolation.
Dual Source Automatic Power Shifter
Sub-millisecond transfer between grid mains and auxiliary secondary AC lines with zero cross-conduction.
Leakage Current Protector
Sub-25ms micro-differential leakage protection designed for critical patient-care and precision industrial facilities.
WiseGrid Industrial 4G Edge Gateway
Sub-millisecond telemetry bridge with zero-conduction galvanic protection
Request Architecture Engineering Review
Receive customized single-line diagrams, circuit calculations, and quantity takeoffs for AISPL-ARCH-PWR-01.